Bina rumah atas tanah sendiri

Build your home on your own landwith fixed stages and no surprises

Inherited a kampung lot, or bought a plot? We design it, get it approved and build it in seven inspected stages, for one fixed price. First-time builders are our favourite customers.

Selangor & Klang Valley · CIDB G5 · CAR insured

Newly finished modern two-storey home with a grey facade and a covered porch, under a blue sky
Fig. 01A finished home, after CCC and handover

02Build cost estimator

What will it cost to build?

Choose what you want to build, how big and which finish. You get a price range in ringgit and a typical build time, and below it, what each stage payment would be.

1 · What are you building?
1400 sq ft
3 · Finish level

Estimated build cost

RM 266k – RM 329k

Typical build time (after approvals)

28–36 weeks

Book a free site visit

Indicative range for a standard site. Excludes land, authority fees, utility connections and extra piling on soft ground. Your fixed price comes after the free site visit and soil check.

PS-7Progress payment schedule

Pay for work that is already there

This table follows the estimator above. Change the type, size or finish and every stage payment updates. It uses the middle of the estimated range as the contract sum.

Estimated range
RM 266,000 – RM 329,000
Contract sum used
RM 298,000
Build time
6.5–8.5 monthsplus 2–4 months for approvals
Seven stage payments, each released after a joint inspection, with percentage and amount
Stage%Amount
1Contract signingThe fixed-price contract is signed. Covers design, approvals and site set-up.10%RM 29,800paid so far RM 29,800
2FoundationPiling or footings and ground beams are poured and pass a joint inspection.15%RM 44,700paid so far RM 74,500
3StructureColumns, beams and floor slabs are complete and the concrete has been inspected.20%RM 59,600paid so far RM 134,100
4Roof & wallsRoof trusses, roof covering and brickwork are complete. The house is weather-tight.20%RM 59,600paid so far RM 193,700
5M&EPlumbing and electrical first-fix are complete and tested.15%RM 44,700paid so far RM 238,400
6FinishingTiling, ceilings, doors, paint and fittings are complete. We issue the punch-list.15%RM 44,700paid so far RM 283,100
7HandoverCCC is issued, keys are handed over and the punch-list is cleared.5%RM 14,900paid so far RM 298,000
Total100%RM 298,000

Each payment is invoiced only after you have inspected the stage with our supervisor and signed the stage certificate. Loan lenders such as LPPSA and banks can pay against the same certificates. The final fixed price is set in your contract after the site visit.

03Our promise

No abandoned projects

Projek terbengkalai is every homeowner’s worst fear. It happens when a builder is paid far ahead of the work. So we put the protection in the contract: you never pay for something that is not there yet.

You are never more than one stage ahead

Teguh Bina Sdn. Bhd.

Janji kerja · Promise of work

Spec sheet
TB-PRM-01
Applies to
Every contract
Rev.
2026
  1. 01

    Stage payments only after a joint inspection

    No stage is invoiced until you (or your representative) and our supervisor have inspected it together and signed the stage certificate.

  2. 02

    Weekly photo report on WhatsApp

    Every Friday you get dated photos of every area worked on, what is next and anything that needs your decision.

  3. 03

    Fixed-price contract, written variation orders

    One price for the signed scope. A change is built only after you sign a Variation Order showing the cost and the time.

  4. 04

    CAR insurance on every site

    Contractors’ All Risks and public liability cover the works, the materials and third parties from day one until handover.

  5. 05

    12-month defect warranty

    We return and fix defects at no cost for 12 months after handover, with inspections at month 6 and month 12.

Hafizuddin Rahman

Founder & Project Manager, for Teguh Bina Sdn. Bhd.

The homeowner

Signed with the contract, copy kept by both parties

TEGUH BINA SDN. BHD. · CIDB G5 ·JANJISAH 2026

04How it works

Six steps from empty land to the keys

You always know what happens next, who does it and how long it takes.

The full process
  1. S-011–2 weeks

    Free site visit & soil check

    We walk your land with you.

  2. S-023–5 weeks

    Design & fixed quotation

    Pick one of our house designs or bring your own.

  3. S-032–4 months

    Approvals (PBT / council)

    We prepare and submit the building plans to your local council (PBT) through a registered Qualified Person, and chase every comment until approval.

  4. S-046–12 months

    Construction in seven stages

    Site clearing, foundation, structure, roof and walls, M&E, finishing.

  5. S-054–8 weeks

    CCC & handover

    We clear the punch-list, apply for the Certificate of Completion and Compliance (CCC) and arrange utilities (TNB, Air Selangor, IWK).

  6. S-0612 months

    12-month defect liability

    If a crack, leak or loose fitting shows up in the first year, call us.

05Recent builds

From empty lot to finished house

Drag the slider to see the same lot before and after. Every project page shows the build stage by stage.

All projects
The same lot with the finished two-storey house, a tiled porch and a front garden
Overgrown flat kampung lot with banana trees and a wire fence before construction
The family lot in Kuang before and after

P-01Featured project

Double-storey family home, Kuang

Location
Kuang, Rawang
Type
Double-storey house
Built-up
2,010 sq ft
Time
11 months build + 3 months approvals
Fixed price
RM 391,000
Handed over
November 2025
See the six stages

06Homeowners

They were nervous too

Most of our clients are first-time builders. This is what they say after handover.

  • “We were afraid of the story you hear about contractors who take the money and vanish. Teguh Bina paid for nothing before we had inspected it ourselves. The WhatsApp photos every Friday meant I always knew where the work stood.”

    Puan Rohaya & Encik Zamri

    Homeowners, Kuang · View project

  • “We had a fixed opening date for our first customer and Teguh Bina worked backwards from it. Every stage payment was tied to an inspection, and we never had to chase for progress.”

    Encik Kamal

    Director, logistics start-up, Klang · View project

  • “We were worried about living through a building site with small children. The crew cleaned up every evening and kept the front of the house usable. It felt like a much shorter project than it was.”

    Encik Faizal & Puan Aina

    Homeowners, Bandar Baru Bangi · View project

07Financing

LPPSA, bank loan or your own savings

Building on your own land is easier to finance than most people think. Lenders pay in stages, and so do you.

  • For civil servants

    LPPSA housing loan

    Build on land you already own. LPPSA releases the loan in stages as the house progresses. We prepare the approved plans, contract and stage schedule that LPPSA asks for.

    LPPSA questions answered
  • For everyone else

    Bank construction financing

    Banks finance a house on your land against the contract and the approved plans. Your claims follow our seven stages, so the bank pays the contractor only for work that has been inspected.

  • Pay as you build

    Your own savings

    Paying cash? The same seven stages protect you. You never pay for work that is not there yet, and every payment comes with a signed stage certificate.

Our seven stage payments, one bar

  1. 10%
  2. 15%
  3. 20%
  4. 20%
  5. 15%
  6. 15%
  7. 5%
  • 1. Contract signing
  • 2. Foundation
  • 3. Structure
  • 4. Roof & walls
  • 5. M&E
  • 6. Finishing
  • 7. Handover

Eligibility, margin and disbursement are decided by your lender. Check the latest terms with LPPSA or your bank. We prepare the approved plans, contract, bill of quantities and stage certificates that lenders usually ask for. For a RM 300,000 contract, stage 3 is RM 60,000.

GOFree, no obligation

Book a free site visit

We walk your land with you, check the soil and access, and tell you honestly what is possible and what it will cost. You get a written note within three working days. Anywhere in Selangor and the Klang Valley.

WhatsAppFree site visit